Skip to content

Public Advisory – BA

The Water Authority of Fiji (WAF) wishes to advise its customers living in parts of Ba area that customers will be experiencing low water pressure to no water at times from this evening (15/01/18) to Tuesday (16/01/18).

This water disruption is a result of the following: 
i) Low level at Waiwai which is still building up as a result of pumps being blocked and Dams partly blocked after yesterday’s flooding.
ii) Low level at Vunisamaloa High-Level Reservoir and burst mains along creek crossings and other locations which are still submerged under water. 
iii) Balevuto Dam is completely closed due to high turbidity of water resulting low water production.

Areas Affected Include;

1. Elevated areas of Navatu, Etatoko, Lavuci, Varavu, Vatiyaka, Sorokoba and Natalecake
2. Rarawai golf link, Saweri, Vaqia, Vunisamaloa, Korovuto, Tevoro Lane, Namada, Veisaru, Navoli and Waibuka 
3. Elevated areas of Naruku, Kumkum, Motoruku, Chinakoti, Part of Moto, Tabataba, Marnitawa, Talaiya, Nasolo, Vatulaulau, Tarivo, Maururu, Tauvegavega, Namosau, Korovatu and Vutuni
4. Elevated areas of Clopcott, Valele, Yalalevu, Nailaga, Varoko, Sarava and Navau 
5. Balevuto, Nukuloa, Nacaci, Vatusui

Our operations team is working round the clock to normalize the system. It is expected that the restoration of water will be completed by Tuesday evening. However, the restoration operation will depend on the weather conditions.

The Authority is kindly advising its customers residing in these areas to store and use water wisely for their immediate needs during this temporary disruption period. Water carts will be on standby to service the affected areas as and when the need arises.

The Authority highly regrets any inconvenience caused to its customers.

For further inquiries, customers can call 3346777 or 5777 (Vodafone, Digicel & Inkk users) or email contact@waf.com.fj, Customers can also call Pramil Kumar on 9104040 and Salote Bale on 9125786 for Water-carting and Dharmendra on 9104514 for reporting the leakages.

Facebook
Twitter
LinkedIn
Email

What is the process and fee for a new water connection?

How much is the Lodgment fee?

  • House under construction / Vacant land / Commercial or Industrial
    • $101.00.
  • Completely built house. – [Please provide a letter from the lands department and/ or completion certificate ]
    • $21.95. [Please provide a letter from the lands department. completion certificate or Stamped Statutory declaration on the completion of the house]

Processing Time

  • Inspection to Approval – 15 Working days from the inspection date.
  • Installation – 30 Working days from payment of New Connection cost, on a first-come, first-serve basis. [Stakeholder processing may cause delays]. *Note: Approval of installation is valid for 3 months from the date of issue.

How much does the new connection cost?

  • Type A – $285 [“T” from existing connection] Type B $345 [direct connection from WAF main line]
  • New connection costs for Commercial and Industrial customers will be estimated according to requirements and a cost will be provided.
  • Road Crossing/ Service Enlargement is payable if required for additional meters requested. This will be communicated when the approval of internal and external stakeholders are obtained. WAF on behalf of FRA will refund any unused monies to the customer where applicable.