Public Advisory – Unplanned Water Disruption Notice

The Water Authority of Fiji (WAF) wishes to advise our customers that the No 1 and 2 Waila Raw Water Pumps will be temporarily switched off to allow our technicians to carry out a detailed inspection of a leakage on the pumping main.

This necessary inspection will allow us to determine the extent of the leak and gauge the works required to rectify the leaking portion of the pumping main, and plan for full repair in the coming weeks.

As a result of these inspection works, inflow into the Waila Treatment Plant will be significantly affected as the raw water pump will need to be switched off to allow the teams to safely inspect the leaking sections of the pumping main.

As such, customers residing in the areas below may experience low water pressure to no water supply and are kindly advised to prepare accordingly and store in their homes, sufficient amounts of water to last them for at least 2 to 3 days.

Affected areas are:

⚬ From Raralevu Reservoir

Ovea, Cautata, Vatoa, Lakena, Vunivivi, Kiuva, Naitalasese, Daku, Maumi, Vusuya, Mokani, Naila, Bau Island, Tokatoka, Nakelo, Rewa, Vunimono, Nadali Airport, Wainibokasi, Naselai

⚬ From Wainibuku Reservoir

Makoi, Nepani, Nadawa, Rt Dovi Road, Dibulu, Lokia, Davuilevu Nakasi, Koronivia, CCC & No Inflow to Tovata, Kalabu, Nasinu, Flagstaff

⚬ From Kalabu Reservoir

Valelevu, Caqiri, Nawanawa, Koka, Kinoya Road, Vasant Lal Vesivesi, Yasiyasi

⚬ From Nasinu Reservoir

Kinoya, Caubati. Manohan, Center Point, Laucala, Nokonoko, Koka, Kinoya road, Vasant Lal, Vesivesi, Fletcher, Mukta Ben

⚬ From Flagstaff Reservoir

Ratu Sukuna Road, Queen Elizabeth Drive, Muanikau Road, Laucala Bay Road, Bau Road, McGregor Road, Domain Road, Victoria Parade from Sukuna Park to Nasese, Nailuva Road & Albert Lee

⚬ From Tovata Reservoir & No Inflow to Nagatugatu Reservoir

Makoi, Kaliveitau, Veitata, Tovata Road, Qaranivalu, Caubati Koro, Daniva, Niubalavu, Raikiwai, Niuvula, Niusawa Lane, Tacirua East, Cunningham, Khalsa Road

We sincerely apologise for any inconvenience caused and we seek your understanding and patience until such time supplies normalise.

For further enquiries, customers can call 3346777 or short code 5777 (all mobile networks) or email contact@waf.com.fj

#TeamWAF #WAF #FijiNews #WaterForFiji💧 #Fiji

Facebook
Twitter
LinkedIn
Email

What is the process and fee for a new water connection?

How much is the Lodgment fee?

  • House under construction / Vacant land / Commercial or Industrial
    • $101.00.
  • Completely built house. – [Please provide a letter from the lands department and/ or completion certificate ]
    • $21.95. [Please provide a letter from the lands department. completion certificate or Stamped Statutory declaration on the completion of the house]

Processing Time

  • Inspection to Approval – 15 Working days from the inspection date.
  • Installation – 30 Working days from payment of New Connection cost, on a first-come, first-serve basis. [Stakeholder processing may cause delays]. *Note: Approval of installation is valid for 3 months from the date of issue.

How much does the new connection cost?

  • Type A – $285 [“T” from existing connection] Type B $345 [direct connection from WAF main line]
  • New connection costs for Commercial and Industrial customers will be estimated according to requirements and a cost will be provided.
  • Road Crossing/ Service Enlargement is payable if required for additional meters requested. This will be communicated when the approval of internal and external stakeholders are obtained. WAF on behalf of FRA will refund any unused monies to the customer where applicable.