Skip to content

WATER INITIATIVES FOR LOW-INCOME HOUSEHOLDS CONTINUE

The Water Authority of Fiji (WAF) would like to advise members of the public that access to water initiatives continue to be available to assist low-income Fijian households.

The Authority understands that water is a necessity for life and, as such, there are Government-subsidised initiatives in place to assist families from low-income households to have access to clean and safe drinking water.

This includes new water meter connections from WAF water mains, which are already done at the minimum cost of $345, covering the basics which include the water meter, all relevant fittings, material, labour, and transportation costs.

For households with a combined annual income of less than $30,000, assistance is provided for new water meter connections by allowing customers to pay a 50% deposit, with the balance to be cleared within 3 months.

In addition to this, these households are eligible for the Free Water Scheme, where the Authority offers a free water allowance of 92,500 litres per year.

Any usage in excess of this will need to be paid for by the customer.

To access the Free Water Scheme, customers are required to provide the Authority with the following:

• Statutory Declaration Form

• WAF Customer Information Form

• Valid Photo ID

• TIN Letter or Joint FNPF/FIRCA Card

• Latest Payslip

• Free Water Usage Allowance Application Form

For more information, you can call 334 6777 or 5777 (all mobile networks), or email contact@waf.com.fj

Facebook
Twitter
LinkedIn
Email

What is the process and fee for a new water connection?

How much is the Lodgment fee?

  • House under construction / Vacant land / Commercial or Industrial
    • $101.00.
  • Completely built house. – [Please provide a letter from the lands department and/ or completion certificate ]
    • $21.95. [Please provide a letter from the lands department. completion certificate or Stamped Statutory declaration on the completion of the house]

Processing Time

  • Inspection to Approval – 15 Working days from the inspection date.
  • Installation – 30 Working days from payment of New Connection cost, on a first-come, first-serve basis. [Stakeholder processing may cause delays]. *Note: Approval of installation is valid for 3 months from the date of issue.

How much does the new connection cost?

  • Type A – $285 [“T” from existing connection] Type B $345 [direct connection from WAF main line]
  • New connection costs for Commercial and Industrial customers will be estimated according to requirements and a cost will be provided.
  • Road Crossing/ Service Enlargement is payable if required for additional meters requested. This will be communicated when the approval of internal and external stakeholders are obtained. WAF on behalf of FRA will refund any unused monies to the customer where applicable.