WAF Update: Wastewater Repairs DN700 along Ratu Mara Road in Nabua – 16.07.22
Maintenance works on the leaking Nabua Wastewater Pump Station DN700 concrete rising main pipeline along Ratu Mara Road, in front of Ratu Sukuna Memorial School
contact@waf.com.fj
5777 or toll-free 1507 (1508 Northern)
Maintenance works on the leaking Nabua Wastewater Pump Station DN700 concrete rising main pipeline along Ratu Mara Road, in front of Ratu Sukuna Memorial School
The Water Authority of Fiji (WAF) says the 2022-2023 National Budget is a strong way forward for Fiji as we begin our journey of recovery
The Water Authority of Fiji (WAF) will carry out urgent wastewater asset maintenance works on a leaking Nabua Wastewater Pump Station DN700 concrete rising main
The Water Authority of Fiji (WAF) would like to advise our valued customers that as part of the commissioning of new water mains from the
We are happy to report that the rectification works along Savuloaloa in Savusavu have been completed, with water restoration commencing shortly – we expect full
We are presently experiencing low raw water inflows from our Savuloaloa intake which is impacting our Reservoir levels at Tavutikau and pumping hours to the
The Water Authority of Fiji (WAF) wishes to advise customers in the Suva-Nausori area that due to the current dry spell being experienced, the Waimanu
Due to new connection and cut-in works to the 300mm main along Princes Road from 9pm Friday (01/07) to 3am Saturday (02/07), water supply will
Due to a power surge which resulted in the malfunction of our electrical breaker at the Waila Water Treatment Plant, as a result of this,
The Water Authority of Fiji (#WAF) would like to advise our valued customers living in the greater Nausori area that the WAF team will be
How much is the Lodgment fee?
Processing Time
How much does the new connection cost?