Skip to content

Planned Water Disruption Notice – Nadi & Lautoka Areas

The Water Authority of Fiji (WAF) intends to carry out urgent repair work on a leaking air valve from one of its duplicate DN600 high-pressure trunk mains that transports from the Nagado Water Treatment Plant to the Nadi and Lautoka area.

WAF wishes to advise its customers that as a result of this repair work, customers living in parts of Nadi and Lautoka listed below will be experiencing low water pressure to no water supply from 𝟴 𝗮𝗺 𝗦𝗮𝘁𝘂𝗿𝗱𝗮𝘆 (𝟬𝟳/𝟬𝟵) 𝘁𝗼 𝟭𝟬 𝗽𝗺 𝗦𝘂𝗻𝗱𝗮𝘆 (𝟬𝟴/𝟬𝟵).

𝗔𝗳𝗳𝗲𝗰𝘁𝗲𝗱 𝗔𝗿𝗲𝗮𝘀 𝗜𝗻𝗰𝗹𝘂𝗱𝗲:

  1. 𝗞𝗮𝘀𝗵𝗺𝗶𝗿 𝗥𝗲𝘀𝗲𝗿𝘃𝗼𝗶𝗿 𝗦𝘂𝗽𝗽𝗹𝘆 𝗭𝗼𝗻𝗲
    Bavadra Road, Ram Sammy Reddy Road, S. M. Koya Road, Sarju Delegate Road, Kashmir Areas, Chandmari, Kermode Road, Tavakubu Back Road, Eddie Wong Street, Musuniwai Street, Vaivai Area, Tawatawa and Tavakubu Village, Sukanaivalu Road, Waiyavi Stage 5, Ganges Road, Riley Place.
  2. 𝗩𝘂𝗱𝗮 𝗥𝗲𝘀𝗲𝗿𝘃𝗼𝗶𝗿 𝗦𝘂𝗽𝗽𝗹𝘆 𝗭𝗼𝗻𝗲
    Viseisei Village, Vuda Point, Dreketi Feeder Road, Delai Saweni, Saweni Beach Road, Lawaki Village, Velovelo Temple Road, Navutu, Vuda Reservoir Inlet customers, Velovelo Rota Tank Road, Natabua seaside, Natabua Prison, Navutu Industrial Area, Viseisei Back Road.
  3. 𝗦𝗮𝗿𝘂 𝗥𝗲𝘀𝗲𝗿𝘃𝗼𝗶𝗿 𝗦𝘂𝗽𝗽𝗹𝘆 𝗭𝗼𝗻𝗲
    Natabua, Navula, Vuda Back Road, Wairabetia, Saru Back Road, Field 40 Area, MN Naidu Road, Balawa, Chandmari High Area, Morris Street, Hedstrom Place, Banaras, Viseisei Back Road, Vuda Back Road from Queens highway, Saru MGM, Top Line Area, Natokowaqa, Ajodhya Road, Josaia Street, Ika Place, Tavai Street, Dawai Street.
  4. 𝗧𝗮𝘃𝗮𝗸𝘂𝗯𝘂 𝗥𝗲𝘀𝗲𝗿𝘃𝗼𝗶𝗿 𝗦𝘂𝗽𝗽𝗹𝘆 𝗭𝗼𝗻𝗲
    V. M. Pillay, Razak Road, Tavakubu Road, Sukanaivalu Road, Waiyavi, Vomo Street, Hollander, Sandalwood, Jinnu Road, Kaunitoni Road, Kara Punja, Cakau Street, Dravuni Street, Ratu Meli Road, Adam Street, Ganges Road, Ram Asre, Golf Link Crescent, Link Road, Maharaj Place, Bulileke, Varamaoli.
  5. 𝗧𝘂𝗮𝗹𝗲𝘀𝗶𝗮 𝗥𝗲𝘀𝗲𝗿𝘃𝗼𝗶𝗿 𝗦𝘂𝗽𝗽𝗹𝘆 𝗭𝗼𝗻𝗲
    Simla area, Thomson Crescent, Waya Street, Valima Hill & surrounding areas
  6. 𝗣𝗵𝗹𝘂𝗴𝗴𝗲𝗿𝘀 𝗥𝗲𝘀𝗲𝗿𝘃𝗼𝗶𝗿 𝗦𝘂𝗽𝗽𝗹𝘆 𝗭𝗼𝗻𝗲
    Lautoka Hospital, Lautoka City, Navutu Industrial, Namoli Industrial, Namoli Village & surrounding areas
  7. 𝗗𝗠𝗢 𝗥𝗲𝘀𝗲𝗿𝘃𝗼𝗶𝗿 𝘀𝘂𝗽𝗽𝗹𝘆 𝗭𝗼𝗻𝗲
    Tagimoucia Street, Natokowaqa & surrounding areas
  8. 𝗡𝗮𝗱𝗲𝗹𝗲 𝗥𝗲𝘀𝗲𝗿𝘃𝗼𝗶𝗿 & 𝗕𝗹𝗮𝗰𝗸𝗿𝗼𝗰𝗸 𝗥𝗲𝘀𝗲𝗿𝘃𝗼𝗶𝗿 𝗦𝘂𝗽𝗽𝗹𝘆 𝗭𝗼𝗻𝗲
    Nadele,Nagado Road, Korobebe, Masimasi, Naboutini, Keolaiya, Thompson Road, Narendra Singh Road, Wailoko, Natalau, Luvuci, Sabeto, Waimalika, Naboutini Back Road, (Kabani Road Intersection to Natalau), Parts of Queen’s Road, RFMF Camp, Elevated areas of Legalega, Elevated areas of Waqadra, Elevated areas of Martintar.
  9. 𝗡𝗮𝗴𝗮𝗱𝗼 𝗥𝗲𝘀𝗲𝗿𝘃𝗼𝗶𝗿 𝗛𝗲𝗮𝗱
    Nasau, Mulomulo, Katiqari, Vutuvutu, Ali Brothers Road, Solovi, Taci, Lolobalvu elevated areas, Lavusa, Masi, Malakua, Malolo, Korovuto, Farmers, Velandan, Nadovi, Arolevu, Nawaicoba, Waireba, Yako, Uciwai Nalovo, Nabila, Momi, Fiji Momi Bay Marriot Resort
  10. 𝗛𝗼𝗹𝗶𝗸𝗮 𝗥𝗲𝘀𝗲𝗿𝘃𝗼𝗶𝗿
    Holika Top, Savalau Road, Rice Mill Votualevu, Blackrock Military Camp.

WAF would like to inform its customers that repair work is critical to address major water loss from this leakage and avoid further damage to the air valve connection and DN600 trunk main should the repairs be prolonged. This will have a further impact on supply to the customers and higher system downtime to address the leakage should the leakage be left unattended.

During the temporary disruption period and for the duration of the repair works, the Lautoka system feeding from the Nagado Water Treatment Plant will be experiencing low water to no water supply.

Water supply to the areas listed above shall be progressively normalized by 12 am Monday (09/09).

Customers residing in the areas listed above are advised to store water for use during this temporary disruption period.

WAF urges customers to conserve and store sufficient amounts of water to last them for at least two to three days in their homes at all times. Customers are also encouraged to invest in storage containers or water tanks connected to the water system for storage and backup water supply during any unplanned disruption that may arise due to emergency works or natural disasters.

We sincerely apologise for any inconvenience caused and we seek your understanding and patience until such time water supply is normalized.

Water carting trucks will be on standby to service the affected areas during the temporary disruption period.

For further enquiries, customers can call (679) 3346777 or short code 5777 (all mobile networks) the WAF Mobile App or email us at contact@waf.com.fj

Facebook
Twitter
LinkedIn
Email

What is the process and fee for a new water connection?

How much is the Lodgment fee?

  • House under construction / Vacant land / Commercial or Industrial
    • $101.00.
  • Completely built house. – [Please provide a letter from the lands department and/ or completion certificate ]
    • $21.95. [Please provide a letter from the lands department. completion certificate or Stamped Statutory declaration on the completion of the house]

Processing Time

  • Inspection to Approval – 15 Working days from the inspection date.
  • Installation – 30 Working days from payment of New Connection cost, on a first-come, first-serve basis. [Stakeholder processing may cause delays]. *Note: Approval of installation is valid for 3 months from the date of issue.

How much does the new connection cost?

  • Type A – $285 [“T” from existing connection] Type B $345 [direct connection from WAF main line]
  • New connection costs for Commercial and Industrial customers will be estimated according to requirements and a cost will be provided.
  • Road Crossing/ Service Enlargement is payable if required for additional meters requested. This will be communicated when the approval of internal and external stakeholders are obtained. WAF on behalf of FRA will refund any unused monies to the customer where applicable.